← Back to list
// Case #03
Boards with no safety data sheet
Estimated Leak Cost
~18,000 PLN · 120 PLN/h × 37.5 h × 4 weeks (agency cover, example)
01Situation
A worker is given a task: strip out wood-based boards. In reality they are bituminous boards (asphaltplatte) — a material whose dust, when stripped dry, irritates the airways. He gets neither information about what the material is, nor a safety data sheet (sikkerhetsdatablad), nor any indication of protective equipment. He strips them for a week without a mask. After a week he goes on a month of sick leave.
02Where Margin Escaped
The bill for one document that wasn't passed on (example amounts):
• Agency replacement: ~120 PLN/h × 37.5 h × 4 weeks = 18,000 PLN.
• Double cost during sick leave: in Norway the first 16 days (arbeidsgiverperioden) are covered by the employer — the company pays at once for the sick worker and for his replacement.
• The new agency worker starts cold, doesn't know the project — typically 10–20% lower productivity during ramp-up.
• Legal risk: a missing safety data sheet and PPE is a breach of employer duties under arbeidsmiljøloven — a potential yrkesskade (occupational injury), claims, an Arbeidstilsynet inspection. A contingent cost, but potentially a multiple of the replacement alone.
Preventing it cost as much as an FFP3 mask — a few tens of złoty. Here the margin doesn't leak through botched work. It leaks through a person's health — and comes back to the company as an invoice.
03Root Cause
Not a lack of knowledge — a lack of one sheet of paper in the right place. The material has a safety data sheet: a document that plainly says 'irritating dust, respiratory protection required'. That sheet existed. It wasn't attached to the task or shown to the worker before he picked up a tool. The document was in the company — just not where and when it protected health.
!How we aim to close it
A material introduced into the project would carry its safety data sheet and required PPE, and a task touching it would show them to the worker before the start; no sheet would mean the task is not ready to release. This is a direction — today Desk does not track materials; a document can be attached to a building.
Read Next Story
Drainage that wasn't in the takeoff
Detail existed in the prefab documentation. Did not enter the takeoff. Collision emerged when framing was already calculated.
Flashing after cladding: double work and a cracked panel
Poor sequencing means work is done twice. And damage without attribution dissolves into 'overhead costs'.